• Skip to content
  • Skip to navigation
Nuneaton and Bedworth Borough Council home Print Fallback Logo
  • Sign in
  • Register
  • Sign in / Register
  • Benefits
  • Bins and recycling
  • Borough plan
  • Business
  • Community life
  • Council and committees
  • Council tax
  • Elections and voting
  • Environment
  • Housing
  • Leisure and culture
  • Licensing
  • Parking, travel and streets
  • Parks and open spaces
  • Planning
  • Strategies and policies

Community Infrastructure Levy - Viability

  1. Home
  2. Planning
  3. Planning policy
  4. Community Infrastructure Levy - Viability
  • Viability Assessment - Whole Plan and Community Infrastructure Levy Viability Study (2014)

    • PDF
    • 1.63MB
    • Download
  • Viability Assessment - Whole Plan and CIL Viability Study - Appendices I, IIa and IIb, summaries and covers combined (2014)

    • PDF
    • 6.05MB
    • Download
  • Viability Assessment - Whole Plan and CIL Viability Study - Appendix III (2014)

    • PDF
    • 3.43MB
    • Download
  • Viability Assessment - Whole Plan and CIL Viability Study - Appendix IV, Glossary (2014)

    • PDF
    • 437kB
    • Download
  • Community Infrastructure Levy - Preliminary Draft Charging Schedule (2015)

    • PDF
    • 647kB
    • Download
  • Viability Assessment - Update (2016)

    • PDF
    • 2.36MB
    • Download
  • Viability Assessment - Appendices (2016)

    • PDF
    • 7.44MB
    • Download
  • Viability Assessment - Appendices I, II, IIb combined with summaries (2016)

    • PDF
    • 4.12MB
    • Download
  • Facebook
  • X
  • Instagram
  • YouTube

2025 © Nuneaton and Bedworth Borough Council

  • Contact us
  • Accessibility
  • Cookies
  • Translate
  • Media
Designed and Powered by Jadu.
Nuneaton and Bedworth Borough Council home Print Fallback Logo